What's the difference between drying and curing?
Drying is water leaving the surface, and it is what you see when wet, dark concrete turns pale. Curing is the chemical reaction between cement and water that makes concrete hard and strong, and it keeps going only while there is water in the mix. Concrete does not harden by drying out. It hardens by curing.
That is why the first days matter so much. If the surface dries out too fast, it can end up weaker than the concrete below it and more likely to crack, dust or flake. A slab that looks dry can still be curing underneath, and one that dried too fast may never reach the strength it was mixed for.
Is cement the same as concrete?
Not quite, though people use the words the same way. Cement is the gray powder in the mix. Stirred together with water, it binds sand and gravel into concrete. A driveway, a patio or a slab is concrete, so that is what the times here are for. Bagged mortar and patch products list their own times on the bag.
How long does concrete take to cure?
Curing never quite stops, but the number you will hear most is 28 days. That is the age at which concrete is usually tested and rated for strength, and by then it is ready for the loads it was built to carry. Much of that strength comes in the first week, which is why that week is when keeping moisture in matters most.
Sealers run on a clock of their own. Some go on the day of the pour and others only after the concrete has cured, so ask your contractor which kind they use and when it goes on.
When can you walk or drive on new concrete?
These are the times you will hear most often for a typical driveway, patio or slab. Your contractor's word for your pour comes first.
- Walking on it: often after 24 to 48 hours. Keep pets, bikes and heavy pots off a little longer, and do not drag anything across it.
- Driving a car on it: often after about 7 days. Keep tires off the edges at first, where the slab has the least support.
- Heavier vehicles: a moving truck, an RV, a loaded trailer or a delivery truck should wait longer. Ask how long for your slab before you schedule a delivery.
- Hot tubs and other heavy loads: wait until the concrete has cured, and check with your contractor before anything heavy goes on it.
Cool or wet weather can stretch every one of these times, so read them as the earliest you might expect, not a guarantee.
What changes the drying time in Georgia?
- Heat and sun. Hot afternoons speed up the set and pull water out of the surface fast, which can leave fine cracks or a weak top. In summer, many crews pour early in the morning to stay ahead of the heat.
- Humidity. Muggy air slows evaporation, which is kind to curing but keeps the surface looking damp longer.
- Rain. Rain on a fresh pour can pit the surface and wash out the finish, so crews watch the forecast and cover the work when a shower comes. Once the concrete has set, rain does little harm and can even help it cure.
- Cool spells. Cool weather slows curing, so a pour on a chilly day takes longer to reach each of the times above.
- The mix. Additives can speed up the set on a cool day or slow it on a hot one, and extra water added on site to make the concrete easier to spread slows drying and weakens it.
- Thickness. A thicker slab holds water longer and takes longer to dry all the way through.
Who protects the new concrete while it cures?
Curing is part of the job, but crews handle it in different ways. Some spray on a curing compound, some cover the slab with plastic or damp blankets, and some ask the homeowner to wet it down for the first few days. Settle these questions in the quote:
- How will you cure the concrete, and is there anything you need me to do?
- How long should we stay off it on foot, and when can we park on it?
- What happens if it rains on pour day or the night after?
- Who puts up barriers to keep people, pets and cars off it?
What does a new pour cost in Georgia?
These are estimates from what Georgia concrete contractors publish, not quotes, and we do not name any company. Each range is per square foot, and it is worth asking whether curing and protecting the pour from weather are in the price.
- Concrete driveway: estimated at $9 to $12+ per sq ft. See what a concrete driveway costs.
- Concrete patio: estimated at $11 to $12+ per sq ft. See what a concrete patio costs.
- Concrete slab: estimated at $9 to $10+ per sq ft. See what a concrete slab costs.
A stamped or colored finish adds sealing to the schedule. See plain or stamped concrete for what that finish asks of you later.
Prices mentioned here come from our Georgia concrete cost ranges, built from the cost guides Georgia concrete contractors publish on their public websites, collected November 2026.